SHIN-KORI-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
OPR-1000
Korea Hydro and Nuclear Power Co.
Korea Hydro and Nuclear Power Co.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
996 MWe
998 MWe
1048 MWe
2825 MWt
Construction Start Date First Criticality Date
16 Jun, 2006
15 Jul, 2010
First Grid Connection Commercial Operation Date
04 Aug, 2010
28 Feb, 2011

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
86.94 TW.h
77.0 %
76.7 %
23.0 %
76.1 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2010 1018.060 1001 2051
2011 7867.030 985 8008 100.0 99.6 99.6 100.2 100.2
2012 7091.410 997 7220 82.2 81.2 89.6 81.0 89.7
2013 2328.100 1000 2338 26.7 26.5 67.2 26.6 67.3
2014 7419.090 999 7497 85.6 98.2 75.3 84.8 71.9
2015 7565.550 999 7656 87.4 86.4 77.6 86.4 74.9
2016 8729.830 997 8784 100.0 99.6 81.4 99.7 79.2
2017 508.500 997 538 6.1 5.8 70.4 5.8 68.4
2018 6997.790 996 7107 81.1 80.2 71.6 80.2 69.9
2019 6500.050 996 6602 75.4 74.5 71.9 74.5 70.4
2020 7895.370 996 7986 90.9 90.2 73.8 90.2 72.5
2021 6828.960 996 6949 79.3 78.2 74.2 78.3 73.0
2022 7467.990 996 7519 85.8 85.3 75.1 85.6 74.1
2023 8723.340 996 8760 100.0 99.6 77.0 100.0 76.1
Performance indicators are calculated from the Commercial Operation Date.