Skip to content
Skip to navigation
Contact Us
IAEA.org
NUCLEUS
World Statistics
Country Statistics
Publications
Glossary
About PRIS
CHERNOBYL-4
Permanent Shutdown
Reactor Details
Reactor Type
Model
Owner
Operator
LWGR
RBMK
SE “NNEGC “ENERGOATOM”
MINTOPENERGO OF UKRAINE - MINISTRY OF FUEL AND ENERGY OF UKRAINE
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
925
MW
e
925
MW
e
1000
MW
e
3200
MW
t
Construction Start Date
First Criticality Date
01 Apr, 1979
26 Nov, 1983
First Grid Connection
Commercial Operation Date
22 Dec, 1983
26 Mar, 1984
Permanent Shutdown Date
26 Apr, 1986
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year
1983
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
1983
Data from a trial operation not provided
1984
Data Not Provided
1985
"
1986
"
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS
Above data generated by the PRIS database. Last update on 2024-09-18
Previous
(CHERNOBYL-3)
(KHMELNITSKI-1)
Next
UKRAINE
CHERNOBYL-1
CHERNOBYL-2
CHERNOBYL-3
CHERNOBYL-4
KHMELNITSKI-1
KHMELNITSKI-2
KHMELNITSKI-3
KHMELNITSKI-4
RIVNE-1
RIVNE-2
RIVNE-3
RIVNE-4
SOUTH UKRAINE-1
SOUTH UKRAINE-2
SOUTH UKRAINE-3
ZAPOROZHYE-1
ZAPOROZHYE-2
ZAPOROZHYE-3
ZAPOROZHYE-4
ZAPOROZHYE-5
ZAPOROZHYE-6