CHERNOBYL-4

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
LWGR
RBMK
SE “NNEGC “ENERGOATOM”
MINTOPENERGO OF UKRAINE - MINISTRY OF FUEL AND ENERGY OF UKRAINE
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
925 MWe
925 MWe
1000 MWe
3200 MWt
Construction Start Date First Criticality Date
01 Apr, 1979
26 Nov, 1983
First Grid Connection Commercial Operation Date
22 Dec, 1983
26 Mar, 1984
Permanent Shutdown Date
26 Apr, 1986

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 1983

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1983 Data from a trial operation not provided
1984 Data Not Provided
1985 "
1986 "
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2024-09-18