ZAPOROZHYE-6

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-320
State Enterprise “National Nuclear Energy Generating Company ‘Energoatom”
State Enterprise “National Nuclear Energy Generating Company ‘Energoatom”
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
950 MWe
950 MWe
1000 MWe
3000 MWt
Construction Start Date First Criticality Date
01 Jun, 1986
06 Oct, 1995
First Grid Connection Commercial Operation Date
19 Oct, 1995
17 Sep, 1996

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
164.50 TW.h
78.6 %
80.5 %
21.4 %
77.8 %
Lifetime performance calculated up to year 2021

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1995 422.830 950 1518
1996 6403.540 950 7871 87.9 85.5 85.5 85.5 85.5
1997 6332.680 950 6640 75.8 75.2 77.3 76.1 78.0
1998 6132.180 950 6766 77.2 73.4 75.6 73.7 76.1
1999 6165.390 950 6934 79.2 74.1 75.1 74.1 75.5
2000 5844.180 950 6191 70.5 69.3 73.7 70.0 74.2
2001 6336.180 950 7118 81.0 75.2 74.0 75.9 74.5
2002 6790.620 950 7393 84.4 81.0 75.1 81.6 75.6
2003 7006.440 950 7590 86.6 83.5 76.3 84.2 76.8
2004 6867.820 950 7715 87.8 81.7 76.9 82.3 77.5
2005 5850.740 950 6557 74.8 83.5 77.6 70.3 76.7
2006 6855.000 950 7317 83.5 83.6 78.2 82.4 77.3
2007 6756.350 950 7275 83.0 83.3 78.7 81.2 77.6
2008 6355.280 950 6888 78.4 83.7 79.1 76.2 77.5
2009 6964.630 950 7285 83.2 82.9 79.4 83.7 78.0
2010 6583.550 950 7181 82.0 80.3 79.4 79.1 78.0
2011 6820.920 950 7254 82.8 81.9 79.6 82.0 78.3
2012 6910.990 950 7496 85.3 82.6 79.8 82.8 78.6
2013 6356.960 950 6819 77.8 76.0 79.6 76.4 78.4
2014 6704.130 950 7217 82.4 80.3 79.6 80.6 78.6
2015 6863.820 950 7601 86.8 79.8 79.6 82.5 78.8
2016 6179.420 950 7225 82.2 77.6 79.5 74.0 78.5
2017 6473.260 950 7450 85.0 80.8 79.6 77.8 78.5
2018 6907.390 950 7188 82.0 79.1 79.6 83.0 78.7
2019 7356.440 950 8015 91.5 86.8 79.9 88.4 79.1
2020 4998.200 950 5492 62.5 67.0 79.3 59.9 78.3
2021 5338.280 950 5693 65.0 61.3 78.6 64.2 77.8
2022 Data Not Provided
2023 "
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-10