KHMELNITSKI-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-320
State Enterprise “National Nuclear Energy Generating Company ‘Energoatom”
State Enterprise “National Nuclear Energy Generating Company ‘Energoatom”
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
950 MWe
950 MWe
1000 MWe
3000 MWt
Construction Start Date First Criticality Date
01 Feb, 1985
01 Aug, 2004
First Grid Connection Commercial Operation Date
07 Aug, 2004
15 Dec, 2005

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
110.18 TW.h
78.3 %
79.8 %
21.7 %
77.1 %
Lifetime performance calculated up to year 2021

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2004 1.570 950 2245
2005 5581.510 950 6376 39.8 100.0 100.0 37.0 37.0
2006 7178.290 950 7697 87.9 86.2 87.2 86.3 82.4
2007 7213.440 950 8008 91.4 89.1 88.1 86.7 84.4
2008 4944.850 950 5263 59.9 59.6 78.9 59.3 76.3
2009 5841.160 950 6126 69.9 69.5 76.6 70.2 74.8
2010 5873.720 950 6124 69.9 69.6 75.2 70.6 74.0
2011 6845.600 950 7333 83.7 82.1 76.4 82.3 75.3
2012 5917.740 950 6774 77.1 71.0 75.6 70.9 74.7
2013 7027.150 950 7391 84.4 84.0 76.6 84.4 75.9
2014 6773.280 950 7121 81.3 80.6 77.1 81.4 76.5
2015 6042.260 950 7523 85.9 83.0 77.7 72.6 76.1
2016 6996.590 950 7587 86.4 85.4 78.4 83.8 76.8
2017 6908.090 950 7354 84.0 81.9 78.7 83.0 77.3
2018 6493.120 950 6816 77.8 77.1 78.5 78.0 77.4
2019 7219.580 950 7679 87.7 86.2 79.1 86.8 78.0
2020 4835.270 950 5785 65.9 63.7 78.1 57.9 76.7
2021 6913.030 950 7619 87.0 82.5 78.3 83.1 77.1
2022 Data Not Provided
2023 "
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04