RIVNE-4

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-320
State Enterprise “National Nuclear Energy Generating Company ‘Energoatom”
State Enterprise “National Nuclear Energy Generating Company ‘Energoatom”
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
950 MWe
950 MWe
1000 MWe
3000 MWt
Construction Start Date First Criticality Date
01 Aug, 1986
26 Sep, 2004
First Grid Connection Commercial Operation Date
10 Oct, 2004
06 Apr, 2006

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
100.11 TW.h
76.0 %
82.0 %
24.0 %
71.0 %
Lifetime performance calculated up to year 2021

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2004 663.230 950 1532
2005 4742.000 950 6131
2006 4781.150 950 6030 65.6 57.0 57.0 51.8 51.8
2007 5560.920 950 7657 87.4 69.5 64.1 66.8 60.4
2008 4368.650 950 7058 80.4 60.4 62.8 52.4 57.4
2009 5402.730 950 8171 93.3 68.9 64.4 64.9 59.4
2010 6135.990 950 7001 79.9 76.1 66.9 73.7 62.4
2011 5471.040 950 6764 77.2 75.0 68.3 65.7 63.0
2012 6260.550 950 7558 86.0 81.0 70.2 75.0 64.8
2013 5045.410 950 7451 85.1 83.7 71.9 60.6 64.3
2014 6177.790 950 7076 80.8 81.1 73.0 74.2 65.4
2015 6503.980 950 7456 85.1 82.5 74.0 78.2 66.7
2016 6728.740 950 7643 87.0 81.2 74.6 80.6 68.0
2017 7107.650 950 7577 86.5 86.1 75.6 85.4 69.5
2018 6819.170 950 7282 83.1 82.7 76.2 81.9 70.5
2019 6398.380 950 6930 79.1 77.5 76.2 76.9 70.9
2020 5031.020 950 5698 64.9 65.4 75.5 60.3 70.2
2021 6818.650 950 7547 86.2 82.4 76.0 81.9 71.0
2022 Data Not Provided
2023 "
Performance indicators are calculated from the Commercial Operation Date.