TORNESS-2

Operational


Reactor Details

Reactor Type Model Owner Operator
GCR
AGR
EDF Energy
EDF Energy
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
605 MWe
645 MWe
682 MWe
1623 MWt
Construction Start Date First Criticality Date
01 Aug, 1980
23 Dec, 1988
First Grid Connection Commercial Operation Date
03 Feb, 1989
03 Feb, 1989

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
136.90 TW.h
76.5 %
82.5 %
23.5 %
74.2 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1989 3633.800 625 7068 89.1 74.2 74.2 73.3 73.3
1990 1948.300 625 4211 48.2 36.1 54.2 35.7 53.6
1991 2651.300 625 5068 58.0 48.4 52.2 48.6 51.8
1992 3732.700 625 6560 73.7 67.0 56.0 67.1 55.8
1993 4038.000 632 7168 82.0 74.4 59.8 73.1 59.4
1994 3478.090 632 6264 71.5 65.5 60.8 62.8 59.9
1995 4651.900 632 7909 87.4 85.9 64.5 81.3 63.1
1996 1571.300 632 2409 27.4 96.2 68.5 28.3 58.7
1997 4217.980 625 7181 81.8 77.7 69.6 76.8 60.7
1998 5094.360 625 8713 99.2 93.7 72.0 92.8 64.0
1999 4983.970 625 8588 97.8 91.1 73.7 90.8 66.4
2000 3936.120 625 7686 87.5 71.7 73.6 71.7 66.8
2001 4293.570 625 8476 96.5 76.6 73.8 78.2 67.7
2002 1945.610 625 3751 42.8 35.7 71.1 35.5 65.4
2003 3782.850 625 6874 78.5 69.4 71.0 69.1 65.7
2004 4082.960 625 7682 87.4 74.6 71.2 74.4 66.2
2005 4821.850 625 8570 97.8 87.8 72.2 88.1 67.5
2006 3297.000 625 6456 73.7 60.5 71.5 60.2 67.1
2007 4829.040 625 8480 96.8 88.3 72.4 88.2 68.2
2008 4780.780 615 8494 96.7 88.2 73.2 88.1 69.2
2009 4151.180 605 7303 83.4 78.3 73.4 78.0 69.6
2010 4531.250 605 8345 95.3 85.5 74.0 85.5 70.3
2011 4417.910 605 8235 94.0 83.5 74.4 83.4 70.8
2012 3717.790 595 6632 75.5 71.4 74.2 71.1 70.9
2013 4672.850 595 8287 94.6 89.7 74.8 89.6 71.6
2014 4718.740 595 8274 94.4 90.4 75.4 90.5 72.3
2015 3711.610 595 6684 76.3 70.9 75.2 71.2 72.2
2016 4982.130 595 8746 99.6 95.1 75.9 95.3 73.0
2017 4853.060 595 8710 99.4 94.0 76.5 93.1 73.7
2018 3680.980 605 6602 75.4 69.3 76.3 69.5 73.6
2019 5059.930 605 8760 100.0 94.8 76.9 95.5 74.3
2020 4904.720 605 8615 98.1 92.0 77.4 92.3 74.8
2021 3589.010 605 7005 80.0 67.5 77.1 67.7 74.6
2022 3076.410 605 6048 69.0 57.8 76.5 58.0 74.1
2023 4055.740 605 6839 78.1 75.5 76.5 76.5 74.2
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04