BELARUSIAN-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-491
Republican Unitary Enterprise "Belarusian Nuclear Power Plant"
Republican Unitary Enterprise "Belarusian Nuclear Power Plant"
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1110 MWe
1110 MWe
1194 MWe
3200 MWt
Construction Start Date First Criticality Date
27 Apr, 2014
25 Mar, 2023
First Grid Connection Commercial Operation Date
13 May, 2023
N/A

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 2021

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2023-06-01