BELARUSIAN-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-491
Republican Unitary Enterprise "Belarusian Nuclear Power Plant"
Republican Unitary Enterprise "Belarusian Nuclear Power Plant"
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1110 MWe
1110 MWe
1194 MWe
3200 MWt
Construction Start Date First Criticality Date
27 Apr, 2014
25 Mar, 2023
First Grid Connection Commercial Operation Date
13 May, 2023
01 Nov, 2023

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
3.32 TW.h
84.6 %
98.5 %
15.4 %
84.6 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2023 3321.120 1110 3674 98.5 84.6 84.6 84.6 84.6
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2025-02-15