BELARUSIAN-2
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
VVER V-491
Republican Unitary Enterprise "Belarusian Nuclear Power Plant"
Republican Unitary Enterprise "Belarusian Nuclear Power Plant"
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
1110
MW
e
1110
MW
e
1194
MW
e
3200
MW
t
Construction Start Date
First Criticality Date
27 Apr, 2014
25 Mar, 2023
First Grid Connection
Commercial Operation Date
13 May, 2023
01 Nov, 2023
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year
2021
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS
Above data generated by the PRIS database. Last update on 2023-12-02