BELARUSIAN-1
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
VVER V-491
Republican Unitary Enterprise "Belarusian Nuclear Power Plant"
Republican Unitary Enterprise "Belarusian Nuclear Power Plant"
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
1110
MW
e
1110
MW
e
1194
MW
e
3200
MW
t
Construction Start Date
First Criticality Date
08 Nov, 2013
11 Oct, 2020
First Grid Connection
Commercial Operation Date
03 Nov, 2020
10 Jun, 2021
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
17.85 TW.h
61.4 %
62.4 %
38.6 %
61.3 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2020
338.430
1110
509
2021
5422.110
1110
5255
59.7
58.8
58.8
58.3
58.3
2022
4411.350
1110
4008
45.8
45.4
50.3
45.4
50.2
2023
7675.400
1110
7054
80.5
79.0
61.4
78.9
61.3
Performance indicators are calculated from the Commercial Operation Date.