BELARUSIAN-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-491
Republican Unitary Enterprise "Belarusian Nuclear Power Plant"
Republican Unitary Enterprise "Belarusian Nuclear Power Plant"
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1110 MWe
1110 MWe
1194 MWe
3200 MWt
Construction Start Date First Criticality Date
08 Nov, 2013
11 Oct, 2020
First Grid Connection Commercial Operation Date
03 Nov, 2020
10 Jun, 2021

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
17.85 TW.h
61.4 %
62.4 %
38.6 %
61.3 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2020 338.430 1110 509
2021 5422.110 1110 5255 59.7 58.8 58.8 58.3 58.3
2022 4411.350 1110 4008 45.8 45.4 50.3 45.4 50.2
2023 7675.400 1110 7054 80.5 79.0 61.4 78.9 61.3
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04


Previous  (BELARUSIAN-2) (BELARUSIAN-2)  Next