LUCENS

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
HWGCR
HWGCR: 2-loops
Nationale Gesellschaft zur Förderung der industriellen Atomtechnik
Energie de l'Ouest Suisse
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
6 MWe
6 MWe
7 MWe
28 MWt
Construction Start Date First Criticality Date
01 Apr, 1962
29 Dec, 1966
First Grid Connection Commercial Operation Date
29 Jan, 1968
N/A
Permanent Shutdown Date
21 Jan, 1969

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 1969

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1968 Data from a trial operation not provided
1969 "
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2025-04-06