SHIDAO BAY-1 ()

Operational


Reactor Details

Reactor Type Model Owner Operator
HTGR
HTR-PM
China Huaneng Group
Huaneng Shandong Shidao Bay Nuclear Power Company, Ltd.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
150 MWe
200 MWe
211 MWe
500 MWt
Construction Start Date First Criticality Date
09 Dec, 2012
12 Sep, 2021
First Grid Connection Commercial Operation Date
14 Dec, 2021
06 Dec, 2023

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
0.11 TW.h
100.0 %
100.0 %
0.0 %
100.4 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2021 86.400 200 432
2022 Data from a trial operation not provided
2023 112.090 150 744 100.0 100.0 100.0 100.4 100.4
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04