FUQING-6

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
HPR1000
CNNC Fujian Fuqing Nuclear Power Co., LTD
CNNC Fujian Fuqing Nuclear Power Co., LTD
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1075 MWe
1075 MWe
1150 MWe
3060 MWt
Construction Start Date First Criticality Date
22 Dec, 2015
11 Dec, 2021
First Grid Connection Commercial Operation Date
01 Jan, 2022
25 Mar, 2022

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 2020

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2022-06-26

Previous  (FUQING-5) (HAIYANG-1)  Next