ZHANGZHOU-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
HPR1000
CNNP Guodian Zhangzhou Energy Co.,Ltd
CNNP Guodian Zhangzhou Energy Co.,Ltd
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1126 MWe
1126 MWe
1212 MWe
3190 MWt
Construction Start Date First Criticality Date
16 Oct, 2019
07 Nov, 2024
First Grid Connection Commercial Operation Date
28 Nov, 2024
01 Jan, 2025

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2025-02-15