Skip to content
Skip to navigation
Contact Us
IAEA.org
NUCLEUS
World Statistics
Country Statistics
Publications
Glossary
About PRIS
KANUPP-3
(K-3)
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
ACP-1000
PAKISTAN ATOMIC ENERGY COMMISSION
PAKISTAN ATOMIC ENERGY COMMISSION
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
1014
MW
e
1014
MW
e
1100
MW
e
3060
MW
t
Construction Start Date
First Criticality Date
31 May, 2016
21 Feb, 2022
First Grid Connection
Commercial Operation Date
04 Mar, 2022
18 Apr, 2022
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year
2020
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS
Above data generated by the PRIS database. Last update on 2023-02-02
Previous
(KANUPP-2)
(CHASNUPP-1)
Next
PAKISTAN
CHASNUPP-1
CHASNUPP-2
CHASNUPP-3
CHASNUPP-4
KANUPP-1
KANUPP-2
KANUPP-3