KANUPP-2 (K-2)

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
ACP-1000
PAKISTAN ATOMIC ENERGY COMMISSION
PAKISTAN ATOMIC ENERGY COMMISSION
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1014 MWe
1014 MWe
1100 MWe
3060 MWt
Construction Start Date First Criticality Date
20 Aug, 2015
28 Feb, 2021
First Grid Connection Commercial Operation Date
18 Mar, 2021
N/A

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 2019

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2021-05-13

Previous  (KANUPP-1) (KANUPP-3)  Next