Skip to content
Skip to navigation
Contact Us
IAEA.org
NUCLEUS
World Statistics
Country Statistics
Publications
Glossary
About PRIS
BARAKAH-4
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
APR-1400
Emirates Nuclear Energy Corporation
Nawah Energy Company
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
1337
MW
e
1310
MW
e
1417
MW
e
3983
MW
t
Construction Start Date
First Criticality Date
30 Jul, 2015
01 Mar, 2024
First Grid Connection
Commercial Operation Date
23 Mar, 2024
05 Sep, 2024
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
5.12 TW.h
83.0 %
89.8 %
17.0 %
83.7 %
Lifetime performance calculated up to year
2024
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2024
5119.360
1337
4886
89.8
83.0
83.0
83.7
83.7
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2026-01-17
Previous
(BARAKAH-3)
(BARAKAH-1)
Next
UNITED ARAB EMIRATES
BARAKAH-1
BARAKAH-2
BARAKAH-3
BARAKAH-4