VOGTLE-4

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
AP-1000
GEORGIA POWER CO.
Southern Nuclear Operating Company, Inc.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1117 MWe
1117 MWe
1250 MWe
3400 MWt
Construction Start Date First Criticality Date
19 Nov, 2013
14 Feb, 2024
First Grid Connection Commercial Operation Date
06 Mar, 2024
29 Apr, 2024

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 2022

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2024-12-04


Previous  (VOGTLE-3) (WATERFORD-3)  Next