Taiwan, China

Summary

REACTORS IN OPERATION
  MW(e) TOTAL NET CAPACITY
Reactors in operation
  NUCLEAR POWER REACTORS
REACTORS UNDER CONSTRUCTION
  MW(e) TOTAL NET CAPACITY
Reactors under construction
  NUCLEAR POWER REACTORS
PERMANENT SHUTDOWN REACTORS
  MW(e) TOTAL NET CAPACITY
Permanent shutdown reactors
  NUCLEAR POWER REACTORS
ELECTRICITY PRODUCTION SHARE IN 2021
26 818 GWh ELECTRICITY SUPPLIED
NUCLEAR SHARE TREND
     

Reactors

Name Type Status Location Reference Unit Power
[MW]
Gross Electrical Capacity
[MW]
First Grid Connection
CHINSHAN-1 BWR Permanent Shutdown SHIHMEN HSIANG 604 636 1977-11-16
CHINSHAN-2 BWR Permanent Shutdown SHIHMEN HSIANG 604 636 1978-12-19
KUOSHENG-1 BWR Permanent Shutdown KUOSHENG 985 985 1981-05-21
KUOSHENG-2 BWR Permanent Shutdown KUOSHENG 985 985 1982-06-29
MAANSHAN-1 PWR Operational HENG CHUN 936 951 1984-05-09
MAANSHAN-2 PWR Operational HENG CHUN 938 951 1985-02-25


Above data generated by the PRIS database. Last update on 2023-03-27