KAKRAPAR-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PHWR
PHWR-700
NUCLEAR POWER CORPORATION OF INDIA, LTD.
NUCLEAR POWER CORPORATION OF INDIA, LTD.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
630 MWe
630 MWe
700 MWe
2166 MWt
Construction Start Date First Criticality Date
22 Nov, 2010
22 Jul, 2020
First Grid Connection Commercial Operation Date
10 Jan, 2021
30 Jun, 2023

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
3.42 TW.h
94.6 %
99.9 %
5.4 %
95.0 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2021 Data from a trial operation not provided
2022 0.760 630 2799
2023 3422.130 630 6443 99.9 94.6 94.6 95.0 95.0
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-18


Previous  (KAKRAPAR-2) (KAKRAPAR-4)  Next