MUELHEIM-KAERLICH (KMK)

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
PWR
PWR
SCN
Kernkraftwerk Gundremmingen GmbH
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1219 MWe
1219 MWe
1302 MWe
3760 MWt
Construction Start Date First Criticality Date
15 Jan, 1975
01 Mar, 1986
First Grid Connection Commercial Operation Date
14 Mar, 1986
18 Aug, 1987
Permanent Shutdown Date
09 Sep, 1988

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
10.29 TW.h
94.7 %
76.0 %
5.3 %
76.4 %
Lifetime performance calculated up to year 1988

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1986 1357.590 1165 0
1987 2904.300 1165 1564 42.6 92.9 92.9 67.9 67.9
1988 6029.360 1219 5884 96.9 95.7 94.7 81.5 76.4
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-10-03