MZFR

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
PHWR
-
Kerntechnische Entsorgung Karlsruhe GmbH
KERNKRAFTWERK-BETRIEBSGESELLSCHAFT MBH
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
52 MWe
50 MWe
57 MWe
200 MWt
Construction Start Date First Criticality Date
01 Dec, 1961
29 Sep, 1965
First Grid Connection Commercial Operation Date
09 Mar, 1966
19 Dec, 1966
Permanent Shutdown Date
03 May, 1984

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
4.79 TW.h
70.8 %
73.3 %
29.2 %
70.6 %
Lifetime performance calculated up to year 1984

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1966 Data from a trial operation not provided
1967 Data Not Provided
1968 "
1969 "
1970 "
1971 334.400 58 5841 66.7 66.0 NC 65.8 NC
1972 434.900 58 7506 85.4 85.2 NC 85.4 NC
1973 88.000 52 1737 19.8 19.3 NC 19.3 NC
1974 326.200 52 6392 73.0 72.3 61.5 71.6 61.4
1975 327.400 52 6442 73.5 72.6 63.6 71.9 63.4
1976 394.200 51 7693 87.6 87.7 67.4 88.0 67.3
1977 295.000 51 5783 66.0 65.6 67.2 66.0 67.1
1978 389.800 51 7730 88.2 86.6 69.5 87.2 69.5
1979 379.000 52 7747 88.4 83.5 71.0 83.2 71.0
1980 327.000 52 6679 76.0 71.8 71.1 71.6 71.1
1981 248.000 52 5111 58.3 54.4 69.6 54.4 69.6
1982 365.000 52 7677 87.6 80.7 70.5 80.1 70.4
1983 305.000 52 6518 74.4 68.5 70.4 67.0 70.2
1984 131.300 52 2855 98.1 88.8 70.8 86.8 70.6
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2024-10-03


Previous  (MUELHEIM-KAERLICH) (NECKARWESTHEIM-1)  Next