LENINGRAD 2-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-491
Joint Stock Company 'Concern Rosenergoatom'
Joint Stock Company 'Concern Rosenergoatom'
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1085 MWe
1101 MWe
1188 MWe
3200 MWt
Construction Start Date First Criticality Date
25 Oct, 2008
06 Feb, 2018
First Grid Connection Commercial Operation Date
09 Mar, 2018
29 Oct, 2018

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
2.34 TW.h
23.8 %
25.1 %
76.2 %
20.3 %
Lifetime performance calculated up to year 2018

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2018 2344.910 1085 3078 25.1 23.8 23.8 20.3 20.3
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2019-08-21

Previous  (KURSK-4) (LENINGRAD 2-2)  Next