NOVOVORONEZH 2-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-392M
Joint Stock Company 'Concern Rosenergoatom'
Joint Stock Company 'Concern Rosenergoatom'
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1101 MWe
1114 MWe
1181 MWe
3200 MWt
Construction Start Date First Criticality Date
12 Jul, 2009
22 Mar, 2019
First Grid Connection Commercial Operation Date
01 May, 2019
31 Oct, 2019

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
34.76 TW.h
81.7 %
84.2 %
18.3 %
80.9 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2019 3557.060 1101 4222 88.2 85.5 85.5 83.5 83.5
2020 7602.610 1101 7367 83.9 81.5 82.1 78.6 79.3
2021 7348.320 1101 6953 79.4 76.7 79.6 76.2 77.9
2022 7875.320 1101 7368 84.1 81.7 80.2 81.6 79.1
2023 8377.150 1101 7767 88.7 86.4 81.7 86.9 80.9
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-10