NOVOVORONEZH 2-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-392M
Joint Stock Company 'Concern Rosenergoatom'
Joint Stock Company 'Concern Rosenergoatom'
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1100 MWe
1114 MWe
1180 MWe
3200 MWt
Construction Start Date First Criticality Date
24 Jun, 2008
20 May, 2016
First Grid Connection Commercial Operation Date
05 Aug, 2016
27 Feb, 2017

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
51.06 TW.h
76.2 %
80.4 %
23.8 %
74.9 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2016 873.280 1114 1528
2017 5620.470 1114 6226 75.1 62.4 62.4 60.9 60.9
2018 7746.870 1114 7378 84.2 81.3 72.7 79.4 70.9
2019 7186.300 1100 6885 78.6 76.7 74.1 74.6 72.2
2020 7602.460 1100 7465 85.0 80.3 75.7 78.7 73.9
2021 7523.130 1100 6953 79.4 78.8 76.3 78.1 74.8
2022 7558.040 1100 7279 83.1 79.2 76.8 78.4 75.4
2023 6950.510 1100 6677 76.2 72.6 76.2 72.1 74.9
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-10