AKADEMIK LOMONOSOV-2
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
KLT-40S 'Floating'
Joint Stock Company 'Concern Rosenergoatom'
Joint Stock Company 'Concern Rosenergoatom'
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
32
MW
e
30
MW
e
35
MW
e
150
MW
t
Construction Start Date
First Criticality Date
15 Apr, 2007
08 Nov, 2018
First Grid Connection
Commercial Operation Date
19 Dec, 2019
22 May, 2020
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
0.31 TW.h
65.0 %
60.4 %
35.0 %
28.2 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2019
2.120
32
312
2020
51.440
32
3942
38.3
77.4
77.4
16.0
16.0
2021
50.360
32
2265
25.9
87.1
83.5
18.0
17.2
2022
85.480
32
6956
79.4
46.3
69.1
30.5
22.4
2023
121.540
32
7793
89.0
54.1
65.0
43.4
28.2
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-11-03
Previous
(AKADEMIK LOMONOSOV-1)
(APS-1 OBNINSK)
Next
RUSSIA
AKADEMIK LOMONOSOV-1
AKADEMIK LOMONOSOV-2
APS-1 OBNINSK
BALAKOVO-1
BALAKOVO-2
BALAKOVO-3
BALAKOVO-4
BELOYARSK-1
BELOYARSK-2
BELOYARSK-3
BELOYARSK-4
BILIBINO-1
BILIBINO-2
BILIBINO-3
BILIBINO-4
BREST-OD-300
KALININ-1
KALININ-2
KALININ-3
KALININ-4
KOLA-1
KOLA-2
KOLA-3
KOLA-4
KURSK 2-1
KURSK 2-2
KURSK-1
KURSK-2
KURSK-3
KURSK-4
LENINGRAD 2-1
LENINGRAD 2-2
LENINGRAD 2-3
LENINGRAD-1
LENINGRAD-2
LENINGRAD-3
LENINGRAD-4
NOVOVORONEZH 2-1
NOVOVORONEZH 2-2
NOVOVORONEZH-1
NOVOVORONEZH-2
NOVOVORONEZH-3
NOVOVORONEZH-4
NOVOVORONEZH-5
ROSTOV-1
ROSTOV-2
ROSTOV-3
ROSTOV-4
SMOLENSK-1
SMOLENSK-2
SMOLENSK-3