AKADEMIK LOMONOSOV-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
KLT-40S 'Floating'
Joint Stock Company 'Concern Rosenergoatom'
Joint Stock Company 'Concern Rosenergoatom'
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
32 MWe
30 MWe
35 MWe
150 MWt
Construction Start Date First Criticality Date
15 Apr, 2007
02 Nov, 2018
First Grid Connection Commercial Operation Date
19 Dec, 2019
22 May, 2020

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
0.34 TW.h
61.7 %
71.0 %
38.3 %
32.0 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2019 0.680 32 312
2020 64.930 32 5138 71.6 90.4 90.4 28.8 28.8
2021 125.260 32 7104 81.1 85.1 87.0 44.7 38.8
2022 74.130 32 6367 72.7 50.0 72.7 26.4 34.0
2023 74.630 32 5143 58.7 33.0 61.7 26.6 32.0
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-10-03


Previous  (SMOLENSK-3) (AKADEMIK LOMONOSOV-2)  Next