PIQUA

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
X
OCM (Organically Cooled and Moderated Reactor)
U.S. Atomic Energy Commission
City of Piqua Government
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
12 MWe
11 MWe
12 MWe
46 MWt
Construction Start Date First Criticality Date
01 Jan, 1960
01 Jan, 1961
First Grid Connection Commercial Operation Date
01 Jul, 1963
01 Nov, 1963
Permanent Shutdown Date
01 Jan, 1966

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 1966

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1963 Data Not Provided
1964 "
1965 "
1966 0 0 0 0 0 NC 0 NC
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2024-09-18


Previous  (PILGRIM-1) (POINT BEACH-1)  Next