GE VALLECITOS

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
BWR
25
General Electric and Pacific Gas and Electric Company
General Electric
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
24 MWe
24 MWe
24 MWe
50 MWt
Construction Start Date First Criticality Date
01 Jan, 1956
03 Aug, 1957
First Grid Connection Commercial Operation Date
19 Oct, 1957
19 Oct, 1957
Permanent Shutdown Date
09 Dec, 1963

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 1963

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1957 Data Not Provided
1958 "
1959 "
1960 "
1961 "
1962 "
1963 "
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2024-09-18