SHIPPINGPORT

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
PWR
PLWBR
Department of Energy and Duquesne Light Co.
Department of Energy and Duquesne Light Co.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
60 MWe
60 MWe
68 MWe
236 MWt
Construction Start Date First Criticality Date
01 Jan, 1954
01 Jan, 1957
First Grid Connection Commercial Operation Date
02 Dec, 1957
26 May, 1958
Permanent Shutdown Date
01 Oct, 1982

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 1957

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1957 Data from a trial operation not provided
1958 Data Not Provided
1959 "
1960 "
1961 "
1962 "
1963 "
1964 "
1965 "
1966 "
1967 "
1968 "
1969 "
1970 "
1971 "
1972 "
1973 "
1974 "
1975 "
1976 "
1977 "
1978 "
1979 "
1980 "
1981 "
1982 "
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2024-09-10