FLAMANVILLE-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
EPR
ÉLECTRICITÉ DE FRANCE
ÉLECTRICITÉ DE FRANCE
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1630 MWe
1630 MWe
1650 MWe
4300 MWt
Construction Start Date First Criticality Date
03 Dec, 2007
03 Sep, 2024
First Grid Connection Commercial Operation Date
21 Dec, 2024
N/A

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2025-01-25