SHIMANE-3

Under Construction


Reactor Details

Reactor Type Model Owner Operator
BWR
ABWR
THE CHUGOKU ELECTRIC POWER CO., INC.
THE CHUGOKU ELECTRIC POWER CO., INC.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1325 MWe
1325 MWe
1373 MWe
3926 MWt
Construction Start Date First Criticality Date
24 Oct, 2006
N/A
First Grid Connection Commercial Operation Date
N/A
N/A


Above data generated by the PRIS database. Last update on 2024-12-04