Skip to content
Skip to navigation
Contact Us
IAEA.org
NUCLEUS
World Statistics
Country Statistics
Publications
Glossary
About PRIS
OLKILUOTO-3
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
EPR
TEOLLISUUDEN VOIMA OYJ
TEOLLISUUDEN VOIMA OYJ
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
1575
MW
e
1600
MW
e
1660
MW
e
4300
MW
t
Construction Start Date
First Criticality Date
12 Aug, 2005
21 Dec, 2021
First Grid Connection
Commercial Operation Date
12 Mar, 2022
01 May, 2023
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
12.26 TW.h
96.3 %
98.6 %
3.7 %
88.8 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2022
1886.770
1600
2145
2023
10371.840
1600
7156
98.6
96.3
96.3
88.8
88.8
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2025-01-24
Previous
(OLKILUOTO-2)
(LOVIISA-1)
Next
FINLAND
LOVIISA-1
LOVIISA-2
OLKILUOTO-1
OLKILUOTO-2
OLKILUOTO-3