KUDANKULAM-2
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
VVER V-412
NUCLEAR POWER CORPORATION OF INDIA, LTD.
NUCLEAR POWER CORPORATION OF INDIA, LTD.
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
932
MW
e
917
MW
e
1000
MW
e
3000
MW
t
Construction Start Date
First Criticality Date
04 Jul, 2002
10 Jul, 2016
First Grid Connection
Commercial Operation Date
29 Aug, 2016
31 Mar, 2017
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
36.24 TW.h
61.7 %
70.5 %
38.3 %
61.9 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2016
749.030
917
1790
2017
4147.800
932
4991
50.2
48.6
48.6
45.8
45.8
2018
2761.230
932
3846
43.9
33.8
40.2
33.8
39.0
2019
4573.820
932
8217
93.8
56.1
46.0
56.0
45.2
2020
5885.370
932
6446
73.4
70.9
52.6
71.9
52.3
2021
5537.430
932
6105
69.7
67.2
55.7
67.8
55.6
2022
6586.510
932
7079
80.8
79.6
59.8
80.7
59.9
2023
5988.250
932
6714
76.6
72.2
61.7
73.4
61.9
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2025-01-25
Previous
(KUDANKULAM-1)
(KUDANKULAM-3)
Next
INDIA
KAIGA-1
KAIGA-2
KAIGA-3
KAIGA-4
KAKRAPAR-1
KAKRAPAR-2
KAKRAPAR-3
KAKRAPAR-4
KUDANKULAM-1
KUDANKULAM-2
KUDANKULAM-3
KUDANKULAM-4
KUDANKULAM-5
KUDANKULAM-6
MADRAS-1
MADRAS-2
NARORA-1
NARORA-2
PFBR
RAJASTHAN-1
RAJASTHAN-2
RAJASTHAN-3
RAJASTHAN-4
RAJASTHAN-5
RAJASTHAN-6
RAJASTHAN-7
RAJASTHAN-8
TARAPUR-1
TARAPUR-2
TARAPUR-3
TARAPUR-4