KUDANKULAM-1
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
VVER V-412
NUCLEAR POWER CORPORATION OF INDIA, LTD.
NUCLEAR POWER CORPORATION OF INDIA, LTD.
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
932
MW
e
917
MW
e
1000
MW
e
3000
MW
t
Construction Start Date
First Criticality Date
31 Mar, 2002
13 Jul, 2013
First Grid Connection
Commercial Operation Date
22 Oct, 2013
31 Dec, 2014
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
49.29 TW.h
63.4 %
68.2 %
36.6 %
63.7 %
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2013
0.290
917
661
2014
2542.230
917
4212
2015
3212.830
917
3993
45.6
39.7
39.7
40.0
40.0
2016
5823.010
932
6828
77.7
71.2
55.6
71.1
55.7
2017
2889.260
932
3937
44.9
36.5
49.2
35.4
48.9
2018
4372.960
932
4997
57.0
53.6
50.3
53.6
50.1
2019
4847.990
932
5349
61.1
59.5
52.2
59.4
51.9
2020
4968.800
932
6369
72.5
60.5
53.6
60.7
53.4
2021
6475.110
932
6982
79.7
78.1
57.1
79.3
57.1
2022
6572.070
932
7228
82.5
79.7
59.9
80.5
60.0
2023
7584.740
932
8141
92.9
91.8
63.4
92.9
63.7
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-09-18
Previous
(KAKRAPAR-4)
(KUDANKULAM-2)
Next
INDIA
KAIGA-1
KAIGA-2
KAIGA-3
KAIGA-4
KAKRAPAR-1
KAKRAPAR-2
KAKRAPAR-3
KAKRAPAR-4
KUDANKULAM-1
KUDANKULAM-2
KUDANKULAM-3
KUDANKULAM-4
KUDANKULAM-5
KUDANKULAM-6
MADRAS-1
MADRAS-2
NARORA-1
NARORA-2
PFBR
RAJASTHAN-1
RAJASTHAN-2
RAJASTHAN-3
RAJASTHAN-4
RAJASTHAN-5
RAJASTHAN-6
RAJASTHAN-7
RAJASTHAN-8
TARAPUR-1
TARAPUR-2
TARAPUR-3
TARAPUR-4