HAMAOKA-5

Suspended Operation


Reactor Details

Reactor Type Model Owner Operator
BWR
ABWR
CHUBU ELECTRIC POWER CO., INC.
CHUBU ELECTRIC POWER CO., INC.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1325 MWe
1325 MWe
1380 MWe
3926 MWt
Construction Start Date First Criticality Date
12 Jul, 2000
23 Mar, 2004
First Grid Connection Commercial Operation Date Suspended Operation Date
30 Apr, 2004
18 Jan, 2005
14 May, 2011

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
38.95 TW.h
17.3 %
17.8 %
82.7 %
17.7 %
Lifetime performance calculated up to year 2021

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2004 3727.560 1325 3754
2005 11870.420 1325 8760 100.0 100.0 100.0 102.2 102.2
2006 3385.190 1325 2515 28.7 28.5 62.7 29.2 64.1
2007 7652.740 1212 6159 70.3 68.6 64.6 71.0 66.3
2008 7516.250 1212 6075 69.2 68.3 65.5 70.6 67.4
2009 1338.270 1212 1076 12.3 12.2 55.1 12.6 56.7
2010 0.000 1212 0 0.0 0.0 46.1 0.0 47.4
2011 3353.430 1325 2557 29.2 29.1 43.5 29.1 44.6
2012 0.000 1325 0 0.0 0.0 37.8 0.0 38.7
2013 0.000 1325 0 0.0 0.0 33.4 0.0 34.2
2014 0.000 1325 0 0.0 0.0 29.9 0.0 30.6
2015 0.000 1325 0 0.0 0.0 27.1 0.0 27.8
2016 0.000 1325 0 0.0 0.0 24.7 0.0 25.4
2017 0.000 1325 0 0.0 0.0 22.8 0.0 23.3
2018 0.000 1325 0 0.0 0.0 21.1 0.0 21.6
2019 0.000 1325 0 0.0 0.0 19.6 0.0 20.1
2020 0.000 1325 0 0.0 0.0 18.4 0.0 18.8
2021 0.000 1325 0 0.0 0.0 17.3 0.0 17.7
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-18