NIEDERAICHBACH (KKN)

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
HWGCR
pressure tube reactor
Karlsruher Institut für Technologie (Kernforschungszentrum Karlsruhe -KfK)
KERNKRAFTWERK NIEDERAICHBACH GMBH
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
100 MWe
100 MWe
106 MWe
321 MWt
Construction Start Date First Criticality Date
01 Jun, 1966
17 Dec, 1972
First Grid Connection Commercial Operation Date
01 Jan, 1973
01 Jan, 1973
Permanent Shutdown Date
31 Jul, 1974

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
0.02 TW.h
0.5 %
9.0 %
99.5 %
1.1 %
Lifetime performance calculated up to year 1974

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1973 1.400 100 117 1.3 -0.4 -0.4 0.2 0.2
1974 13.800 100 1128 22.2 2.1 0.5 2.7 1.1
Performance indicators are calculated from the Commercial Operation Date.


Above data are from the PRIS database. Last update on 2018-11-19