NIEDERAICHBACH
(KKN)
Decommissioning Completed
Reactor Details
Reactor Type
Model
Owner
Operator
HWGCR
pressure tube reactor
Karlsruher Institut für Technologie (Kernforschungszentrum Karlsruhe -KfK)
KERNKRAFTWERK NIEDERAICHBACH GMBH
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
100
MW
e
100
MW
e
106
MW
e
321
MW
t
Construction Start Date
First Criticality Date
01 Jun, 1966
N/A
First Grid Connection
Commercial Operation Date
N/A
N/A
Permanent Shutdown Date
31 Jul, 1974
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
0.02 TW.h
0.5 %
9.0 %
99.5 %
1.1 %
Lifetime performance calculated up to year
1974
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
1973
1.400
100
117
1.3
-0.4
-0.4
0.2
0.2
1974
13.800
100
1128
22.2
2.1
0.5
2.7
1.1
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-09-10
Previous
(NECKARWESTHEIM-2)
(OBRIGHEIM)
Next
GERMANY
AVR JUELICH
BIBLIS-A
BIBLIS-B
BROKDORF
BRUNSBUETTEL
EMSLAND
GRAFENRHEINFELD
GREIFSWALD-1
GREIFSWALD-2
GREIFSWALD-3
GREIFSWALD-4
GREIFSWALD-5
GROHNDE
GUNDREMMINGEN-A
GUNDREMMINGEN-B
GUNDREMMINGEN-C
HDR GROSSWELZHEIM
ISAR-1
ISAR-2
KNK II
KRUEMMEL
LINGEN
MUELHEIM-KAERLICH
MZFR
NECKARWESTHEIM-1
NECKARWESTHEIM-2
NIEDERAICHBACH
OBRIGHEIM
PHILIPPSBURG-1
PHILIPPSBURG-2
RHEINSBERG
STADE
THTR-300
UNTERWESER
VAK KAHL
WUERGASSEN