TEMELIN-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-320
CZECH POWER Co., CEZ a.s.
CZECH POWER Co., CEZ a.s.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1029 MWe
1029 MWe
1082 MWe
3120 MWt
Construction Start Date First Criticality Date
01 Feb, 1987
31 May, 2002
First Grid Connection Commercial Operation Date
29 Dec, 2002
18 Apr, 2003

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
119.18 TW.h
77.5 %
78.3 %
22.5 %
77.9 %
Lifetime performance calculated up to year 2020

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2002 0.000 930 5
2003 6033.030 930 6934 86.5 84.2 84.2 86.6 86.6
2004 6340.090 950 6678 76.0 75.2 78.8 76.0 80.2
2005 4941.360 780 6135 70.0 65.1 73.9 65.3 74.9
2006 5251.850 930 5765 65.8 65.3 71.6 65.4 72.3
2007 6745.100 963 7051 80.5 79.9 73.4 80.5 74.1
2008 6978.750 963 7420 84.5 82.6 75.1 82.5 75.6
2009 6363.180 963 6756 77.1 75.4 75.2 75.4 75.6
2010 6847.340 963 7135 81.5 81.0 75.9 81.2 76.4
2011 6311.620 963 6589 75.2 74.8 75.8 74.8 76.2
2012 7349.910 963 7656 87.2 86.8 77.0 86.9 77.3
2013 7246.820 1003 7448 85.0 84.5 77.7 84.4 78.0
2014 6989.250 1003 6980 79.7 79.3 77.8 79.6 78.1
2015 5926.470 1026 5813 66.4 66.2 76.9 66.8 77.2
2016 5730.120 1026 5617 64.0 62.9 75.8 63.6 76.1
2017 7252.350 1026 7024 80.2 79.8 76.1 80.7 76.5
2018 7402.410 1027 7208 82.3 81.6 76.4 82.3 76.9
2019 7813.140 1027 7555 86.2 86.0 77.0 86.8 77.5
2020 7660.960 1029 7398 84.2 84.0 77.5 84.9 77.9
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2021-10-19