TEMELIN-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-320
CZECH POWER Co., CEZ a.s.
CZECH POWER Co., CEZ a.s.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
1027 MWe
1027 MWe
1082 MWe
3120 MWt
Construction Start Date First Criticality Date
01 Feb, 1987
11 Oct, 2000
First Grid Connection Commercial Operation Date
21 Dec, 2000
10 Jun, 2002

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
123.25 TW.h
75.3 %
76.1 %
24.7 %
75.6 %
Lifetime performance calculated up to year 2020

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2000 2.310 963 29
2001 1064.340 930 2205
2002 5147.870 930 5961 82.4 76.1 76.1 77.0 77.0
2003 5455.320 912 5861 66.9 65.3 69.3 68.3 71.5
2004 5715.820 950 6029 68.6 68.0 68.8 68.5 70.3
2005 5443.970 930 5846 66.7 66.3 68.1 66.4 69.2
2006 6124.860 930 6731 76.8 75.7 69.8 75.2 70.5
2007 4901.350 963 5282 60.3 60.0 68.0 59.6 68.6
2008 4526.450 963 4745 54.0 53.5 65.7 53.5 66.2
2009 6229.780 963 6527 74.5 73.8 66.8 73.8 67.2
2010 6305.630 963 6594 75.3 74.5 67.7 74.8 68.1
2011 6915.590 963 7205 82.2 81.8 69.2 82.0 69.6
2012 7159.770 963 7515 85.6 84.7 70.7 84.6 71.0
2013 7018.650 1003 7252 82.8 82.2 71.7 82.1 72.0
2014 7194.590 1023 7092 81.0 80.8 72.5 81.3 72.8
2015 7581.240 1026 7400 84.5 83.9 73.4 84.4 73.7
2016 5786.940 1026 5868 66.8 64.1 72.7 64.2 73.0
2017 8410.140 1026 8205 93.7 93.3 74.1 93.6 74.4
2018 7487.600 1027 7321 83.6 83.1 74.7 83.2 75.0
2019 7169.400 1027 7088 80.9 79.6 75.0 79.7 75.3
2020 7294.100 1027 7178 81.7 80.9 75.3 80.9 75.6
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2021-10-19