BEAVER VALLEY-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
WH 3LP (DRYSUB)
OHIO EDISON CO.
FIRST ENERGY NUCLEAR OPERATING CO.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
905 MWe
836 MWe
958 MWe
2900 MWt
Construction Start Date First Criticality Date
03 May, 1974
04 Aug, 1987
First Grid Connection Commercial Operation Date
17 Aug, 1987
17 Nov, 1987

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
236.91 TW.h
89.1 %
88.6 %
10.9 %
87.2 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1987 738.100 836 950 100.0 100.0 100.0 93.4 93.4
1988 6477.060 833 8224 93.6 93.8 94.3 88.5 88.9
1989 4557.140 833 6245 71.3 71.7 83.4 62.4 76.2
1990 4291.550 820 6734 76.9 77.1 81.4 59.2 70.7
1991 6762.160 820 8720 99.5 99.5 85.8 94.1 76.4
1992 5647.130 820 7342 83.6 94.8 87.6 78.4 76.8
1993 5212.680 820 6770 77.3 77.3 85.9 72.6 76.1
1994 7024.730 820 8481 96.8 96.8 87.4 97.8 79.2
1995 6047.020 820 7616 86.9 87.0 87.4 84.2 79.8
1996 4788.590 820 6169 70.2 70.3 85.5 66.5 78.3
1997 6158.700 820 7583 86.6 86.6 85.6 85.7 79.0
1998 1808.720 820 2179 24.9 25.1 80.2 25.2 74.2
1999 5752.520 820 7155 81.7 81.7 80.3 80.1 74.7
2000 6227.850 820 7804 88.8 88.9 81.0 86.5 75.6
2001 7191.650 831 8702 99.3 99.4 82.3 99.8 77.3
2002 6604.310 831 8133 92.8 93.0 83.0 90.7 78.2
2003 6636.990 831 8037 91.8 91.8 83.5 91.2 79.0
2004 7314.830 831 8784 100.0 100.0 84.5 100.2 80.3
2005 6680.030 831 8169 93.2 93.3 85.0 91.8 80.9
2006 6309.510 851 7673 87.6 87.6 85.1 84.6 81.1
2007 7473.200 846 8760 100.0 100.0 85.9 100.8 82.1
2008 6726.200 890 7744 88.2 87.9 86.0 87.8 82.4
2009 6193.960 846 7651 87.3 86.7 86.0 83.6 82.4
2010 7874.150 885 8760 100.0 100.0 86.7 101.6 83.3
2011 7085.780 885 7920 90.4 90.4 86.8 91.4 83.7
2012 7032.520 885 7828 89.1 89.1 86.9 90.5 84.0
2013 7818.590 885 8458 96.5 96.6 87.3 100.8 84.7
2014 7279.910 904 7929 90.5 90.7 87.4 91.9 85.0
2015 7255.590 904 7931 90.5 90.5 87.6 91.6 85.2
2016 7868.440 904 8579 97.7 97.7 87.9 99.1 85.7
2017 7312.330 905 8058 92.0 92.0 88.1 92.2 85.9
2018 7222.740 905 8085 92.3 92.3 88.2 91.1 86.1
2019 8039.570 905 8760 100.0 100.0 88.6 101.4 86.6
2020 7345.660 905 8190 93.2 93.2 88.8 92.4 86.8
2021 6610.080 905 7784 88.9 88.8 88.8 83.4 86.7
2022 8015.620 905 8760 100.0 100.0 89.1 101.1 87.1
2023 7005.570 905 7708 88.0 87.9 89.1 88.4 87.2
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2025-04-22