Reactor Details

Reactor Type Model Owner Operator
BWR
Superheater
US DOE and Puerto Rico Electric Power Authority
DOE & PUERTO RICO WATER RESOURCES
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
17 MWe
17 MWe
18 MWe
50 MWt
Construction Start Date First Criticality Date
01 Jan, 1960
13 Apr, 1964
First Grid Connection Commercial Operation Date
14 Aug, 1964
01 Sep, 1965
Permanent Shutdown Date
01 Jun, 1968

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 1964

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1964 Data from a trial operation not provided
1965 Data Not Provided
1966 "
1967 "
1968 "
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2024-09-10