ROBINSON-2 (H. B. Robinson 2)

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
WH 3LP (DRYAMB)
PROGRESS ENERGY Carolinas, Inc.
Progress Energy
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
741 MWe
700 MWe
780 MWe
2339 MWt
Construction Start Date First Criticality Date
13 Apr, 1967
20 Sep, 1970
First Grid Connection Commercial Operation Date
26 Sep, 1970
07 Mar, 1971

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
259.80 TW.h
81.7 %
80.5 %
18.3 %
80.4 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1970 Data from a trial operation not provided
1971 2538.600 739 4078 48.1 100.0 100.0 43.1 43.1
1972 5082.400 739 7487 85.2 100.0 100.0 78.3 62.2
1973 3765.500 715 6591 75.2 75.7 91.6 60.1 61.5
1974 4813.100 700 7297 83.3 83.3 89.5 78.5 65.8
1975 4170.900 665 6316 72.1 71.0 86.0 71.6 66.9
1976 4874.200 667 7435 84.6 82.5 85.4 83.2 69.6
1977 4130.200 665 7462 85.2 70.8 83.4 70.9 69.8
1978 3980.000 665 6307 72.0 68.2 81.5 68.3 69.6
1979 4005.100 665 6172 70.5 68.7 80.1 68.8 69.5
1980 3210.900 665 5464 62.2 61.8 78.3 55.0 68.1
1981 3510.800 665 6391 73.0 73.4 77.9 60.3 67.4
1982 2268.400 665 4278 48.8 47.9 75.4 38.9 65.0
1983 3347.500 665 6609 75.4 75.5 75.4 57.5 64.4
1984 224.280 665 615 7.0 7.0 70.6 3.8 60.2
1985 5239.910 665 7697 87.9 87.6 71.7 90.0 62.1
1986 4799.600 665 7028 80.2 79.7 72.2 82.4 63.4
1987 4235.470 665 6224 71.0 70.3 72.1 72.7 63.9
1988 3182.430 665 5717 65.1 64.2 71.7 54.5 63.4
1989 2790.530 665 4107 46.9 45.5 70.3 47.9 62.6
1990 3319.190 665 5614 64.1 63.2 70.0 57.0 62.3
1991 4792.240 683 7048 80.5 80.2 70.4 81.3 63.2
1992 4062.910 683 5812 66.2 66.2 70.2 67.7 63.4
1993 4193.270 683 6137 70.1 70.1 70.2 70.1 63.7
1994 4655.060 683 6845 78.1 78.2 70.6 77.8 64.3
1995 5033.830 683 7356 84.0 84.0 71.1 84.1 65.1
1996 5460.100 683 7745 88.2 88.2 71.8 91.0 66.1
1997 6197.590 683 8662 98.9 98.9 72.8 103.6 67.5
1998 5505.560 683 7751 88.5 88.5 73.4 92.0 68.4
1999 5684.480 683 8009 91.4 91.4 74.0 95.0 69.4
2000 6237.080 683 8750 99.6 99.6 74.9 104.0 70.5
2001 5515.040 683 7919 90.4 90.4 75.4 92.2 71.2
2002 5606.110 683 7960 90.9 90.9 75.9 93.7 71.9
2003 6439.900 710 8760 100.0 100.0 76.6 103.5 73.0
2004 5742.210 710 7811 88.9 88.9 77.0 92.1 73.5
2005 5770.140 710 7839 89.5 89.5 77.4 92.8 74.1
2006 6442.700 710 8705 99.4 99.4 78.0 103.6 75.0
2007 5737.920 710 7825 89.3 89.3 78.3 92.3 75.5
2008 5429.260 710 7380 84.0 84.0 78.5 87.0 75.8
2009 6473.190 710 8667 98.9 99.0 79.0 104.1 76.5
2010 3598.360 724 4902 56.0 56.8 78.4 56.7 76.0
2011 6363.800 724 8677 99.0 99.1 79.0 100.3 76.6
2012 5388.110 741 7165 81.6 81.9 79.1 83.2 76.8
2013 5696.460 741 7446 85.0 85.0 79.2 87.8 77.1
2014 6159.410 741 7975 91.0 91.0 79.5 94.9 77.5
2015 5723.720 741 7413 84.6 84.6 79.6 88.2 77.8
2016 6432.190 741 8441 96.1 96.1 80.0 98.8 78.3
2017 5930.080 741 7752 88.5 88.5 80.2 91.4 78.6
2018 5278.140 741 7009 80.0 80.0 80.2 81.3 78.6
2019 6376.320 741 8207 93.7 93.7 80.5 98.2 79.0
2020 6124.630 741 8001 91.1 91.1 80.7 94.1 79.4
2021 6361.890 741 8395 95.8 95.8 81.0 98.0 79.8
2022 5695.940 741 7339 83.8 94.6 81.3 87.8 79.9
2023 6693.970 741 8689 99.2 98.8 81.7 103.1 80.4
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-09-10

Previous  (RIVER BEND-1) (SALEM-1)  Next