SAN ONOFRE-1

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
PWR
PWR
SOUTHERN CALIFORNIA EDISON Co.
SOUTHERN CALIFORNIA EDISON Co.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
436 MWe
436 MWe
456 MWe
1347 MWt
Construction Start Date First Criticality Date
01 May, 1964
14 Jun, 1967
First Grid Connection Commercial Operation Date
16 Jul, 1967
01 Jan, 1968
Permanent Shutdown Date
30 Nov, 1992

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
51.13 TW.h
59.8 %
55.1 %
40.2 %
53.2 %
Lifetime performance calculated up to year 1992

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1967 Data from a trial operation not provided
1968 Data Not Provided
1969 "
1970 3207.000 450 0 0.0 100.0 NC 81.4 NC
1971 3468.000 450 8186 93.4 100.0 100.0 88.0 84.7
1972 2965.000 450 6799 77.4 100.0 100.0 75.0 81.4
1973 2275.400 430 5503 62.8 60.4 90.4 60.4 76.4
1974 3145.100 430 7541 86.1 84.6 89.3 83.5 77.8
1975 3245.100 430 7657 87.4 86.2 88.8 86.2 79.1
1976 2476.600 430 6160 70.1 65.6 85.5 65.6 77.2
1977 2338.800 435 5584 63.7 61.3 82.5 61.4 75.2
1978 2680.400 436 7021 80.2 70.2 81.2 70.2 74.7
1979 3355.500 436 7904 90.2 87.9 81.8 87.9 76.0
1980 816.500 436 1960 22.3 22.8 76.5 21.3 71.0
1981 778.700 436 2334 26.6 26.6 72.3 20.4 66.8
1982 510.200 436 1372 15.7 15.7 68.0 13.4 62.7
1983 0.000 436 0 0.0 0.0 63.2 0.0 58.3
1984 278.520 436 822 9.4 9.4 59.6 7.3 54.9
1985 2459.630 436 6728 76.8 76.8 60.6 64.4 55.5
1986 881.490 436 2729 31.2 31.2 58.9 23.1 53.6
1987 2710.820 436 7321 83.6 83.6 60.3 71.0 54.5
1988 1384.400 436 3803 43.3 43.3 59.4 36.2 53.6
1989 1179.700 436 3446 39.3 39.4 58.4 30.9 52.4
1990 1561.620 436 4145 47.3 47.3 57.9 40.9 51.9
1991 2027.400 436 5660 64.6 64.6 58.2 53.1 51.9
1992 2925.880 436 8021 99.8 99.8 59.8 83.5 53.2
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS