PEACH BOTTOM-1

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
HTGR
Exelon Generation Co., LLC
Exelon Generation Co., LLC
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
40 MWe
40 MWe
42 MWe
115 MWt
Construction Start Date First Criticality Date
01 Feb, 1962
03 Mar, 1966
First Grid Connection Commercial Operation Date
27 Jan, 1967
01 Jun, 1967
Permanent Shutdown Date
01 Nov, 1974

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
1.35 TW.h
NC
NC
NC
NC
Lifetime performance calculated up to year 1974

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1967 Data Not Provided
1968 "
1969 "
1970 "
1971 "
1972 "
1973 181.200 37 5245 59.9 60.0 NC 55.9 NC
1974 169.100 40 6157 84.4 86.0 NC 57.9 NC
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2025-02-15


Previous  (PATHFINDER) (PEACH BOTTOM-2)  Next