ELK RIVER

Permanent Shutdown


Reactor Details

Reactor Type Model Owner Operator
BWR
-
US Department of Energy
RURAL COOPERATIVE POWER ASSOC.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
22 MWe
22 MWe
24 MWe
58 MWt
Construction Start Date First Criticality Date
01 Jan, 1959
01 Nov, 1962
First Grid Connection Commercial Operation Date
24 Aug, 1963
01 Jul, 1964
Permanent Shutdown Date
01 Feb, 1968

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
NC
NC
NC
NC
NC
Lifetime performance calculated up to year 1963

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1963 Data from a trial operation not provided
1964 Data Not Provided
1965 "
1966 "
1967 "
1968 "
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS


Above data generated by the PRIS database. Last update on 2024-10-03


Previous  (DUANE ARNOLD-1) (FARLEY-1)  Next