MOCHOVCE-2

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-213
SLOVENSKÉ ELEKTRÁRNE, A.S.
SLOVENSKÉ ELEKTRÁRNE, A.S.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
469 MWe
408 MWe
500 MWe
1471 MWt
Construction Start Date First Criticality Date
13 Oct, 1983
01 Dec, 1999
First Grid Connection Commercial Operation Date
20 Dec, 1999
11 Apr, 2000

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
77.34 TW.h
87.8 %
89.9 %
12.2 %
86.1 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1999 Data from a trial operation not provided
2000 2641.420 404 7513 89.6 87.9 87.9 83.3 83.3
2001 2540.880 404 6967 79.5 72.1 78.9 71.8 76.8
2002 2498.360 405 6862 78.3 71.7 76.2 70.4 74.4
2003 2964.870 405 7729 88.2 87.4 79.2 83.6 76.9
2004 2034.500 405 7210 82.1 81.4 79.7 57.2 72.7
2005 3050.880 405 7900 90.2 88.5 81.2 86.0 75.0
2006 2787.170 405 7254 82.8 81.0 81.2 78.6 75.6
2007 3191.350 405 8082 92.3 90.8 82.4 90.0 77.4
2008 3070.500 436 7797 88.8 87.8 83.1 85.2 78.3
2009 3414.880 436 8128 92.8 90.9 83.9 89.4 79.5
2010 3189.950 436 7574 86.5 84.4 84.0 83.5 79.9
2011 3480.320 436 8195 93.6 91.6 84.6 91.1 80.9
2012 3476.420 436 8121 92.4 90.4 85.1 90.8 81.7
2013 3581.830 436 8274 94.4 93.3 85.7 93.8 82.7
2014 3392.490 436 7842 89.5 88.4 85.9 88.8 83.1
2015 3561.230 436 8296 94.7 93.4 86.4 93.2 83.8
2016 3535.750 436 8268 94.1 92.6 86.8 92.3 84.3
2017 3543.320 436 8280 94.5 93.2 87.2 92.8 84.8
2018 3271.120 436 7642 87.2 85.3 87.1 85.6 84.8
2019 3398.930 436 7922 90.4 88.6 87.2 89.0 85.0
2020 3332.800 469 8112 92.4 85.3 87.1 86.5 85.1
2021 3747.560 469 8155 93.1 91.0 87.3 91.2 85.4
2022 3800.500 469 8249 94.2 92.4 87.5 92.5 85.8
2023 3848.010 469 8327 95.1 93.5 87.8 93.7 86.1
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2025-01-25


Previous  (MOCHOVCE-1) (MOCHOVCE-3)  Next