MOCHOVCE-1

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-213
SLOVENSKÉ ELEKTRÁRNE, A.S.
SLOVENSKÉ ELEKTRÁRNE, A.S.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
467 MWe
408 MWe
500 MWe
1471 MWt
Construction Start Date First Criticality Date
13 Oct, 1983
09 Jun, 1998
First Grid Connection Commercial Operation Date
04 Jul, 1998
29 Oct, 1998

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
81.90 TW.h
87.3 %
89.9 %
12.7 %
86.6 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1998 936.280 408 3343 99.0 95.0 95.0 93.5 93.5
1999 2376.140 404 6397 73.0 65.8 70.0 67.1 71.0
2000 2816.900 404 8311 94.6 79.4 74.4 79.4 74.8
2001 2423.590 404 6648 75.9 68.2 72.4 68.5 72.8
2002 2914.760 405 7628 87.1 83.3 75.0 82.2 75.1
2003 2796.620 405 7324 83.6 82.3 76.4 78.8 75.8
2004 2995.970 405 7801 88.8 88.1 78.3 84.2 77.2
2005 2712.570 405 7128 81.4 80.3 78.6 76.5 77.1
2006 3059.750 405 7977 91.0 90.0 80.0 86.2 78.2
2007 3142.720 405 7954 90.8 89.2 81.0 88.6 79.3
2008 3329.400 436 8064 91.8 90.6 82.0 89.6 80.4
2009 3111.640 436 7466 85.2 82.0 82.0 81.5 80.5
2010 3446.790 436 8074 92.2 91.0 82.8 90.2 81.3
2011 3542.880 436 8235 94.0 92.9 83.6 92.8 82.2
2012 3532.610 436 8188 93.2 92.1 84.2 92.2 83.0
2013 3526.150 436 8195 93.6 92.3 84.8 92.3 83.6
2014 3530.120 436 8259 94.3 92.4 85.3 92.4 84.2
2015 3436.310 436 8067 92.1 91.0 85.6 90.0 84.6
2016 3478.220 436 8185 93.2 91.6 86.0 90.8 84.9
2017 3208.450 436 7542 86.1 84.2 85.9 84.0 84.9
2018 3539.850 436 8299 94.7 93.4 86.3 92.7 85.3
2019 3547.110 436 8225 93.9 92.5 86.6 92.9 85.6
2020 3610.010 436 8322 94.8 93.8 86.9 94.3 86.0
2021 3438.550 467 8083 92.3 86.1 86.9 86.9 86.1
2022 3753.950 467 8253 94.2 91.9 87.1 91.8 86.3
2023 3764.660 467 8256 94.2 92.0 87.3 92.0 86.6
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2025-01-25


Previous  (BOHUNICE-4) (MOCHOVCE-2)  Next