MOCHOVCE-3
Operational
Reactor Details
Reactor Type
Model
Owner
Operator
PWR
VVER V-213
SLOVENSKÉ ELEKTRÁRNE, A.S.
SLOVENSKÉ ELEKTRÁRNE, A.S.
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
440
MW
e
440
MW
e
471
MW
e
1375
MW
t
Construction Start Date
First Criticality Date
Construction Suspension Date
Construction Restart Date
27 Jan, 1987
22 Oct, 2022
27 Jan, 1990
27 Jan, 2015
First Grid Connection
Commercial Operation Date
31 Jan, 2023
N/A
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
1.95 TW.h
NC
NC
NC
NC
Lifetime performance calculated up to year
2023
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
2023
1945.270
440
7416
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS
Above data generated by the PRIS database. Last update on 2024-09-18