MOCHOVCE-3

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-213
SLOVENSKÉ ELEKTRÁRNE, A.S.
SLOVENSKÉ ELEKTRÁRNE, A.S.
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
438 MWe
440 MWe
470 MWe
1375 MWt
Construction Start Date First Criticality Date Construction Suspension Date Construction Restart Date
27 Jan, 1987
22 Oct, 2022
27 Jan, 1990
27 Jan, 2015
First Grid Connection Commercial Operation Date
31 Jan, 2023
06 Nov, 2024

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
8.12 TW.h
86.9 %
87.6 %
13.1 %
87.8 %
Lifetime performance calculated up to year 2025

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
2023 1945.270 440 7416
2024 2841.270 434 6890
2025 3331.000 438 7627 87.1 86.5 86.9 87.5 87.8
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2026-07-17