Skip to content
Skip to navigation
Contact Us
IAEA.org
NUCLEUS
World Statistics
Country Statistics
Publications
Glossary
About PRIS
BOHUNICE A1
Permanent Shutdown
Reactor Details
Reactor Type
Model
Owner
Operator
HWGCR
KS 150
JADROVA A VYRADOVACIA SPOLOCNOST /NUCLEAR AND DECOMMISSIONING COMPANY, plc./
JADROVA A VYRADOVACIA SPOLOCNOST /NUCLEAR AND DECOMMISSIONING COMPANY, plc./
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
93
MW
e
110
MW
e
143
MW
e
560
MW
t
Construction Start Date
First Criticality Date
01 Aug, 1958
24 Oct, 1972
First Grid Connection
Commercial Operation Date
25 Dec, 1972
25 Dec, 1972
Permanent Shutdown Date
22 Feb, 1977
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
0.92 TW.h
32.7 %
52.4 %
67.3 %
26.2 %
Lifetime performance calculated up to year
1977
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
1972
Data from a trial operation not provided
1973
122.500
110
4620
52.7
12.7
12.7
12.7
12.7
1974
303.290
90
6905
78.8
60.6
34.3
38.5
24.3
1975
123.440
100
2146
24.5
20.4
29.7
14.1
20.9
1976
288.800
93
4219
48.0
39.0
31.7
39.0
24.9
1977
77.780
93
1219
86.1
59.1
32.7
59.1
26.2
Performance indicators are calculated from the Commercial Operation Date.
Above data generated by the PRIS database. Last update on 2024-09-18
Previous
(MOCHOVCE-4)
(BOHUNICE-1)
Next
SLOVAKIA
BOHUNICE A1
BOHUNICE-1
BOHUNICE-2
BOHUNICE-3
BOHUNICE-4
MOCHOVCE-1
MOCHOVCE-2
MOCHOVCE-3
MOCHOVCE-4