Reactor Details
Reactor Type
Model
Owner
Operator
PHWR
Vattenfall AB
AB SVAFO
Reference Unit Power (Net Capacity)
Design Net Capacity
Gross Capacity
Thermal Capacity
10
MW
e
9
MW
e
12
MW
e
80
MW
t
Construction Start Date
First Criticality Date
01 Dec, 1957
17 Jul, 1963
First Grid Connection
Commercial Operation Date
01 May, 1964
01 May, 1964
Permanent Shutdown Date
02 Jun, 1974
LifeTime Performance
Electricity Supplied
Energy Availability Factor
Operation Factor
Energy Unavailability Factor
Load Factor
0.40 TW.h
NC
NC
NC
NC
Lifetime performance calculated up to year
1974
Operating History
Year
Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual
Cumulative
Annual
Cumulative
1964
Data Not Provided
1965
"
1966
"
1967
"
1968
"
1969
"
1970
"
1971
30.000
12
3072
35.1
28.5
NC
28.5
NC
1972
49.000
12
0
0.0
100.0
NC
46.5
NC
1973
43.500
10
6345
72.4
58.6
NC
49.7
NC
1974
18.100
10
3563
97.6
78.3
NC
49.7
NC
Performance indicators are calculated from the Commercial Operation Date.
NC – cumulative values not calculated when more than 50% of required data is missing in PRIS
Above data generated by the PRIS database. Last update on 2021-01-26
Previous
(RINGHALS-4)
(BARSEBACK-1)
Next
SWEDEN
AGESTA
BARSEBACK-1
BARSEBACK-2
FORSMARK-1
FORSMARK-2
FORSMARK-3
OSKARSHAMN-1
OSKARSHAMN-2
OSKARSHAMN-3
RINGHALS-1
RINGHALS-2
RINGHALS-3
RINGHALS-4