BALAKOVO-4

Operational


Reactor Details

Reactor Type Model Owner Operator
PWR
VVER V-320
Joint Stock Company 'Concern Rosenergoatom'
Joint Stock Company 'Concern Rosenergoatom'
Reference Unit Power (Net Capacity) Design Net Capacity Gross Capacity Thermal Capacity
950 MWe
950 MWe
1000 MWe
3200 MWt
Construction Start Date First Criticality Date
01 Apr, 1984
24 Mar, 1993
First Grid Connection Commercial Operation Date
11 Apr, 1993
22 Dec, 1993

LifeTime Performance

Electricity Supplied Energy Availability Factor Operation Factor Energy Unavailability Factor Load Factor
213.01 TW.h
81.6 %
85.6 %
18.4 %
83.8 %
Lifetime performance calculated up to year 2023

Operating History

Year Electricity Supplied
[GW.h]
Reference Unit Power
[MW]
Annual Time On Line
[h]
Operation Factor
[%]
Energy Availability Factor
[%]
Load Factor
[%]
Annual Cumulative Annual Cumulative
1993 3676.280 950 5206
1994 3828.530 950 4604 52.6 48.4 48.4 46.0 46.0
1995 5609.990 950 8760 100.0 86.5 67.4 67.4 56.7
1996 4545.550 950 6652 75.7 55.5 63.4 54.5 56.0
1997 4637.720 950 6637 75.8 59.6 62.5 55.7 55.9
1998 5042.490 950 6936 79.2 60.9 62.2 60.6 56.8
1999 5803.910 950 7268 83.0 69.6 63.4 69.7 59.0
2000 6665.850 950 7216 82.2 79.0 65.6 79.9 62.0
2001 6578.090 950 7354 84.0 78.3 67.2 79.0 64.1
2002 6292.920 950 6723 76.8 72.8 67.8 75.6 65.4
2003 7223.840 950 7541 86.1 84.6 69.5 86.8 67.5
2004 7022.940 950 7540 85.8 82.5 70.7 84.2 69.0
2005 6938.280 950 7699 87.9 82.1 71.6 83.4 70.2
2006 6805.350 950 7230 82.5 79.6 72.3 81.8 71.1
2007 7153.350 950 7787 88.9 84.7 73.2 86.0 72.2
2008 8330.420 950 8779 99.9 99.7 74.9 99.8 74.0
2009 7409.950 950 7727 88.2 87.8 75.7 89.0 75.0
2010 7199.690 950 7168 81.8 81.4 76.1 86.5 75.6
2011 7625.200 950 7619 87.0 86.4 76.6 91.6 76.5
2012 8517.840 950 8608 98.0 97.7 77.8 102.1 77.9
2013 7847.250 950 7847 89.6 89.1 78.3 94.3 78.7
2014 7204.520 950 7173 81.9 81.3 78.5 86.6 79.1
2015 8800.050 950 8757 100.0 100.0 79.4 105.7 80.3
2016 8006.240 950 8045 91.6 91.1 80.0 95.9 81.0
2017 7336.590 950 7386 84.3 84.0 80.1 88.2 81.3
2018 8777.020 950 8760 100.0 100.0 80.9 105.5 82.2
2019 6075.810 950 5952 68.0 67.8 80.4 73.0 81.9
2020 7368.350 950 7307 83.2 83.1 80.5 88.3 82.1
2021 8516.230 950 8296 94.7 94.6 81.0 102.3 82.8
2022 8167.110 950 7962 90.9 90.7 81.3 98.1 83.4
2023 7999.260 950 7797 89.0 88.8 81.6 96.1 83.8
Performance indicators are calculated from the Commercial Operation Date.


Above data generated by the PRIS database. Last update on 2024-12-04